Programme software for construction

Construction programmes without the complexity.

Build, track and report your programme in one place. Import the main contractor's PDF, enter progress each week, and see exactly how many days you're behind, and why.

Works on a computer, tablet or phone. Nothing to install.

A Nexa programme showing tasks, progress, slip in days and a Gantt chart with weekly drop lines

Everything you need to run the programme. Nothing you don't.

Made for subcontractors and site teams who need a clear programme, not a training course.

Import PDF programmes

Upload the main contractor's programme from Asta or Project. Nexa reads in the tasks, dates and durations, so you're not typing it all out.

Slip in working days

See how many days each task is late or early, against the plan and against your baseline. No guesswork, no spreadsheets.

Weekly drop lines

A progress line at every report date shows where you're behind at a glance, week after week.

One-click weekly reports

A progress report with your logo, with the full programme at the back. Export to PDF, or to Excel for Asta.

Delay records with photos

Record the cause and add photo evidence, stamped with the date, time and location. Ready when the questions come.

Built for your team

Invite your team with one code. Everyone sees the same programmes, and other companies never see yours.

Up and running in an afternoon

  1. 1

    Set up your company

    Request access, then add your logo and details. They go on every report you send.

  2. 2

    Import or build your programme

    Read in a PDF or add tasks yourself. Link them in order with one click.

  3. 3

    Update weekly and report

    Enter % done each Friday. Nexa works out the slip and builds the report for you.

Get your programme under control

New accounts are usually approved within one working day.

Nexa
Privacy policySign in

Nexa is a trading name of AGH Management Limited. Registered in England and Wales, company no. 16150527. Registered office: 103 Washway Road, Sale, England, M33 7TY. © 2026 AGH Management Limited.

Nexa

Construction programmes without the complexity.

  • Import a main contractor's PDF programme in seconds
  • Track slip in working days, with weekly drop lines
  • One-click weekly progress reports with your own logo

Sign in

Welcome back. Sign in to your company's programmes.

New to Nexa?

Read our privacy policy.

Nexa

Set up your company

Programmes belong to a company, so everyone in your team sees the same ones.

Start a new company

You'll be the admin and can invite your team.

Join your company

Ask your company admin for the 8-character invite code.

Nexa

Thanks for signing up

Your account is waiting for approval. You'll be able to use Nexa as soon as it's approved, usually within one working day.

Joining your company's team?

If your company already uses Nexa, enter its invite code to get in straight away.

Nexa

Almost there

This copy of Nexa isn't connected to its database yet. Open config.js, paste in your Supabase project URL and anon key, then upload the files again. The setup guide explains where to find them.

Nexa
A new version of Nexa is ready. Reload to get the latest features. Your work is saved first.
Add your company name, logo and contact details. They go on every programme you export.
0 rows selected
Someone else changed this programme. Your latest edit wasn't saved, so nobody's work is overwritten.
Weekly progress update due.
Start–
Finish–
Duration–
Slip–
Progress · planned–
Connecting…

Loading programmes…

Your saved programmes will appear here.

Weekly progress reminders

Pick when your working week ends. Nexa will remind you to update progress on every live programme, and you can add the same reminder to your phone's calendar.

Reminder in Nexa

When you open Nexa after this time, any programme that hasn't had progress entered that week is flagged, with a banner on the programme and a count on this tab.

Notification on your phone

Add a repeating weekly event to your calendar, so your phone alerts you even when Nexa isn't open. It uses the day and time above.

Add to Google Calendar Outlook or iPhone: create a weekly event called Update Nexa progress on Fridays at 15:00 with an alert.

Your programmes this week

ProgrammeStatusLast progressFinish

How to use Nexa

The basics, one step at a time.

Getting startedAdding and moving tasksSelecting several rowsLinking tasksWeekly progress and slipDelays and photo evidenceShutdowns and holidaysReports and exportsRemindersYour teamUse it like an app

Getting started

  1. Click the company button (top right, it shows your company name) and add your company name, logo and contact details. They go on every PDF and report.
  2. Click New to start a programme, or Import PDF to read in a programme from Asta or Project.
  3. Fill in the bar at the top: programme name, main contractor, ref, revision and report date.
  4. Everything saves by itself. Look for Saved on the right of the toolbar.

Adding and moving tasks

  1. Click Task or Milestone to add one under the selected row.
  2. Click any cell to type in it: name, duration (working days), start or % done.
  3. Indent makes a task sit under a heading. Outdent moves it back out.
  4. Move a task with the up and down arrows, or drag its line number.
  5. Made a mistake? Click Undo.

Selecting several rows

  1. On a computer: Ctrl+click line numbers to pick rows, or Shift+click to pick a range.
  2. On an iPad or phone: tap Select, then tap the line numbers.
  3. A bar appears where you can link them, indent, set % done or delete them all at once.

Linking tasks

  1. Links make the programme move by itself. Push one task back and everything after it follows.
  2. Quickest: click Auto-link to link everything in the order it's listed.
  3. Drag: drag from the end of one bar onto another bar.
  4. From part-way along a bar: turn on Link mode (or hold Shift) and drag from any point.
  5. Type it: in the Links column, type the line number, e.g. 4, 4SS+2 or 4FF.

Weekly progress and slip

  1. Once the programme is agreed, click Save baseline. This is what slip is measured against.
  2. Each week, set the report date, then type the % done for each task you've worked on.
  3. Planned shows where you should be. Slip shows how many working days late (+) or early (−) a task will finish.
  4. Vs baseline shows how far the plan has moved since the baseline was saved.
  5. Drop lines show the lag at each week on the chart. Click it to turn them on or off.

Delays and photo evidence

  1. Click a task. The details panel opens at the bottom.
  2. Pick a Delay cause and write notes: what happened, when, who was told, RFI or instruction numbers.
  3. Add photos as evidence. Nexa saves the date, time and location with each one.
  4. To remove a photo, open it and click Delete photo.

Shutdowns and holidays

  1. Bank holidays are already set.
  2. Click Calendar to add Christmas or other site shutdowns. Tasks skip those days.

Reports and exports

  1. Weekly report: a progress report for the main contractor, with the full programme at the back.
  2. Export PDF: the programme with your logo and details.
  3. Export Excel: a spreadsheet you can import into Asta Powerproject.

Reminders

  1. Open the Reminders tab and choose your day and time, e.g. Friday 15:00.
  2. Nexa flags any programme that hasn't been updated that week.
  3. Click Add to Google Calendar so your phone reminds you too.

Your team

  1. Open the Team tab and click Copy invite message. Send it by email or WhatsApp.
  2. They sign up, choose Join your company and enter the code.
  3. Everyone in your company sees the same programmes. Other companies never see them.
  4. If the code gets shared too widely, click Issue a new code. The old one stops working.

Use it like an app

  1. Click your initial (top right) and choose Install Nexa as an app.
  2. On iPhone or iPad: open Nexa in Safari, tap Share, then Add to Home Screen.

Approving sign-ups (admins only)

  1. New people wait for approval. A number shows on the Admin tab when someone is waiting.
  2. Open Admin and click Approve or Decline. Remove access blocks someone later.
  3. Choose Only new companies if staff with an invite code should get straight in.

Still stuck? Contact the person who set up Nexa for your company.

Sign-ups

Approve new accounts before they can use Nexa. Only site admins can see this page.

Who needs approving

Accounts

NameEmailTypeSigned upStatus

Your team

Everyone in your company sees and edits the same programmes. Each person sets their own reminders.

Invite people

Send this code to colleagues. They create a Nexa account, choose Join your company and enter the code.

––––––––

Issuing a new code stops the old one working. People already in the team stay in.

People

NameEmailRoleJoined

Your account

Auto-link tasks

Links each task to the one listed above it, finish to start, so the programme follows the order you've set out.

Which tasks

Options

Overlapping tasks get a start-to-start link with the right lag, and gaps between tasks become lags, so nothing moves. Untick for plain finish-to-start links, where each task waits for the one above to finish. Leave this off where groups run at the same time, e.g. different floors with separate gangs.

Working calendar

Monday to Friday, excluding England & Wales bank holidays. Add shutdowns and site closures for this programme.

NameFromTo

What's new in Nexa

    Install Nexa

    Get Nexa as an app with its own icon. It opens full screen and updates itself.

    Evidence photo

    Import programme from PDF

    Check what was read before it goes into your programme.

    Your company

    Your logo and details appear on every page of the programmes your team exports.

    Company name

    Address

    Phone

    Email

    Website

    Logo

    No logo uploaded
    PNG or JPG works best. It sits small in the top-left corner of every PDF page.
    Drop the PDF programme to import it